SILVER
LANDIS ARCHITECTS/BUILDERS
WASHINGTON, D.C.
landisconstruction.com
Project name: Attic Master Suite
Location: Washington, D.C.
Square footage: 650
Project cost: $220,000
T
his remodel took the master suite in
the 1923 home from 600 to 700 sq.
ft. by moving into the previous attic
space. Te team removed the wood
paneling on the walls and ceiling, and pushed
the existing wall back so it had a lower height
around the perimeter. Te room has two dormers
with windows and a skylight, several of which
were replaced with larger units to maximize
daylight. Custom clerestory glass panels wrap
around the corner of the bathroom enclosure to
allow light to fow from the dormers and skylight
into the bathroom; the door is frosted to main-
tain privacy but still allow natural light. Te
large marble-walled and foored shower has ft-
tings on opposite ends. Horizontal chrome bands
lend a more modern touch, as does the ice blue
tile accent and long drain. Two closets in the
eaves ofer additional storage. Te HVAC system
is located in the eaves.
|
BRONZE
Associates in Building and Design,
Fort Collins, Colo.
abd-ltd.com
Room
Remodel
42 September 2015 QR QualifiedRemodeler.com
The Speed You Need
Regardless of the job or project, you don't want a construction adhesive
to slow you down. You need it to set fast, have excellent strength, and reliably
work on a variety of building materials, so you can move on to the next task
and not worry about call-backs.
Titebond Fast Set delivers the bond you want, with the strength
and speed you need.
titebond.com/FastSet
For more info circle 53