Project name:
Brand Universal Design Project
Location: Arlington, Va.
Square footage: 200
Project cost: $112,500
T
he Glickman Design Build team had one month to complete
the renovation of this 18th foor condo for a client with ALS.
Te homeowners were away for the duration of the project,
but returned to fnd a beautiful, accessible bathroom. With
such a restricted time frame, materials were selected for appearance
and with consideration to availability. Design options for the condo's
bathroom were limited and involved relocating some existing items
while completely removing others. An existing medicine cabinet, vanity
base cabinets and sink were relocated within the space while a built-in
cabinet and shelves, electrical work, toilet, sink and new tile were
added. Wood framed partitions were built for an accessible shower,
and a Schluter membrane system was added to the walls and foor of
the shower. Working on the 18th foor provided its own challenges,
but the Glickman team works in condos regularly and knew the ins
and outs of being as efcient as possible when dealing with parking,
elevator and other building issues.
|
GOLD
SPACE ARCHITECTS + PLANNERS
CHICAGO, ILL.
spa cearchplan.com
Project name: Everman Lofts
Location: Chcago, Ill.
Square footage: 12,700
Project cost: $1,955,000
T
his 12,700-sq.-ft. rehabilitation project
returned the exterior to its former glory
and converted this historic church struc-
ture into 11 dwelling units. It also restored
the former clergy house at the church's rear. Unit
confgurations worked around the symmetry of the
original building exterior and openings in an efort
Light Commercial
More Than 5,000
Square Feet
SILVER
Rabits & Romano Architecture
Orlando, Fla.
rabits-architect.com
BRONZE
Kirchman Construction
Stuart, Fla.
kirchmanconstruction.com
to not impact the envelope. Exterior renovation in-
cluded repairing and restoring the decorative stained
glass windows along with installing new windows
to match at the ground level, previously flled with
glass block. Te roofng, decorative metalwork and
masonry all were repaired to honor the architectural
heritage of the original church structure.
|
48 September 2015 QR QualifiedRemodeler.com